CASE STUDY

WAREHOUSE VOID FILL

Problem

An interior floating slab had been compromised due to a fire riser break. The fire riser ruptured and flooded out thousands of gallons of water under the slab and created a large void. The ECO FillFoam contractor was contacted to evaluate the void.

FillFoam Solution

The ECO FillFoam installer was awarded the job due to the quick and effective void-filling solution. First, a portion of the slab was cut out, while another portion was deemed salvageable by the engineering firm through the use of the FillFoam installation. The installer strategically drilled 84 x 1” holes into the slab to ensure proper coverage of the FillFoam installed. FillFoam was pumped quickly and safely with zero heat. FillFoam is the ideal choice for any void. It flowed easily to the deep crevice created.

Summary

This void was filled in just one day with 400 lbs. of FillFoam. After the void was filled, a layer of polyurethane foam was installed on top before the concrete was poured above.

Crew working on abandoned culvert
FillFoam culvert fill
Abandoned Culvert under railroad track